Aiken County · Marker 02-37

R Reactor

near the intersection of Roads E & G, Savannah River Site (Not Open to the Public)

Front inscription

One of five production reactors at the Savannah River Plant, now Savannah River Site, R Reactor produced plutonium and tritium for national defense. Built 1951-53, it was the first of the five reactors to go on-line, with initial start-up on Dec. 28, 1953. The first irradiated fuel left the reactor in June 1954. The reactor continued operation until final shut-down in 1964.

Reverse inscription

This was the first production reactor to use heavy water as the neutron moderator and coolant. It was also the first to have vertical fuel and control rod assemblies, with more than 600 positions in the reactor tank. Originally rated at 378 MW, R Reactor achieved power levels many times that. It was the largest of the SRP reactors and was a prototype for the other four.

County
Aiken
Region
Midlands
City or vicinity
Savannah River Site
Year approved
2008
Erected by
U.S. Department of Energy
Coordinates
33.2743, -81.578333

Explore related stories

Get directions Open in the interactive app